Brent System
The Brent System pipeline transports oil from the North Sea oilfields via Cormorant Alpha to the Sullom Voe Terminal in Shetland, Scotland.[1] Oil is transported from 20 oilfields, including:
- Thistle
- Murchison
- Hutton
- North West Hutton
- Dunlin
- Brent A, B,C & D
- Cormorant Alpha
- North Cormorant
- Tern
- Eider
| Brent System | |
|---|---|
| Location | |
| Country | Scotland, United Kingdom | 
| General direction | north-south-west | 
| From | North Sea oilfields | 
| Passes through | Cormorant Alpha | 
| To | Sullom Voe Terminal | 
| General information | |
| Type | oil | 
| Operator | TAQA Bratani | 
| Technical information | |
| Length | 147 km (91 mi) | 
| Maximum discharge | 100,000 bbl/d (16,000 m3/d) | 
| Diameter | 36 in (914 mm) | 
The pipeline is 36 inches (910 mm) diameter steel (API 5L X60) of 147 kilometres (91 mi) in length. It has capacity of 100,000 barrels per day (16,000 m3/d).[1]
Since 3 August 2009, it is operated by Abu Dhabi National Energy Company replacing the previous operator Royal Dutch Shell.[1][2] The Brent system is jointly owned by 21 companies.[1]
References
    
- "Taqa takes Brent pipe reins". Upstream Online. NHST Media Group. 3 August 2009. Retrieved 6 August 2009.
- Christopher Johnson, Barbara Lewis (3 August 2009). "Abu Dhabi firm says becomes N. Sea Brent operator". Reuters. Archived from the original on 4 January 2013. Retrieved 6 August 2009.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.


