Sennichimae Line
The Osaka Metro Sennichimae Line (千日前線, Sennichimae-sen) is an underground rapid transit line in Osaka, Japan. It is one of the lines of Osaka Metro. It links the northwestern district of Fukushima-ku and the southeastern district of Ikuno-ku with the central commercial and entertainment district of Namba. The line is paralleled by the underground Kintetsu Namba Line/Hanshin Namba Line connection line in its central section. Its official name is Rapid Electric Tramway Line No. 5 (高速電気軌道第5号線), while the Osaka Municipal Transportation Bureau refers to it as Osaka City Rapid Railway Line No. 5 (大阪市高速鉄道第5号線), and in MLIT publications, it is written as Line No. 5 (Sennichimae Line) (5号線(千日前線)). Station numbers are indicated by the letter S.
| Sennichimae Line | |||
|---|---|---|---|
![]() Sennichimae Line 25 series EMU  | |||
| Overview | |||
| Line number | 5 | ||
| Locale | Osaka | ||
| Termini | Nodahanshin Minami-Tatsumi[1]  | ||
| Stations | 14 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Osaka Metro | ||
| Operator(s) | Osaka Metro (2018–present)  Osaka Municipal Transportation Bureau (1969–2018)  | ||
| Depot(s) | Morinomiya (located on Chūō Line) | ||
| History | |||
| Opened | April 16, 1969 | ||
| Technical | |||
| Line length | 12.6 km (7.8 mi) | ||
| Track length | 13.1 km (8.1 mi) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 750 V DC, third rail | ||
| Operating speed | 70 km/h (43 mph) | ||
  | |||
| Route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
  | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platform screen doors are located at all of the stations. The first station, Minami-Tatsumi, had them installed on March 14, 2014 and operation started in April. The final station, Nodahanshin, had them installed and operating in December.[2][3] All platforms are long enough for 8 car trains however a part of each platform has been blocked off, since only four-car trains are needed to carry the amount of traffic on the line. Which in 2013 carries on average 181,238 passengers per day.[4]
Stations
    
Rolling stock
    
    Current
    
- 25 series (since 1991)
 
As there is no dedicated rolling stock depot on the Sennichimae Line, trains are forwarded to Morinomiya Depot on the Chūō Line via a connecting track at Awaza.
Former
    
- 50 series (1969–1994)
 - 100 series (later version) (1979–1989)
 - 30 series (1991–1995)
 
History
    
- April 16, 1969 – Nodahanshin – Sakuragawa (opening)
 - July 25, 1969 – Tanimachi Kyūchōme – Imazato (opening)
 - September 10, 1969 – Imazato – Shin-Fukae (opening)
 - March 11, 1970 – Sakuragawa – Tanimachi Kyūchōme (opening)
 - December 2, 1981 – Shin-Fukae – Minami-Tatsumi (opening)
 
References
    
- Hitachi Review. Hitachi. 3 March 2014. p. 75. Retrieved 6 August 2014.
 - "Osaka subway's Sennichimae Line to have platform screen doors installed in every station Chinese translation to follow". Asian Public Transport. February 13, 2014. Retrieved September 8, 2014.
 - 可動式ホーム柵の設置について [About platform doors] (in Japanese). Osaka Municipal Transportation Bureau. Retrieved January 28, 2016.
 - "路線別経常収支" (PDF).
 - 路線別で探す 千日前線 (in Japanese). Osaka Municipal Transportation Bureau. Retrieved August 6, 2014.
 
| Wikimedia Commons has media related to Sennichimae Line. | 

