Grand Av Arts/Bunker Hill station
Grand Av Arts/Bunker Hill station is an under-construction underground light rail station on the A Line and the E Line of the Los Angeles Metro Rail system. It is located near the intersection of 2nd Place and Hope Street in the Bunker Hill section of Downtown Los Angeles.[1]
![]() Grand Av Arts/Bunker Hill station under construction, May 2018 | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Bunker Hill Los Angeles, California | |||||||||||||||
| Coordinates | 34.054997°N 118.251996°W | |||||||||||||||
| Owned by | Metro | |||||||||||||||
| Platforms | 1 island platform | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Parking | Paid parking nearby | |||||||||||||||
| Disabled access | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Status | Under construction | |||||||||||||||
| History | ||||||||||||||||
| Opening | 2022 | |||||||||||||||
| Previous names | 2nd Place/Hope | |||||||||||||||
| Future services | ||||||||||||||||
| ||||||||||||||||
| Location | ||||||||||||||||
![]() | ||||||||||||||||
In planning documents, the station was originally going to be named 2nd Place/Hope.[2]
Location
The station will be connected to the Broad, and to Grand Avenue, by a pedestrian bridge.[3]
Grand Av Arts/Bunker Hill is part of the Regional Connector project, a tunnel through Downtown Los Angeles that will connect the Metro Rail A, E, and L Lines. Under current plans, the station will be served by both the restructured A Line, connecting Long Beach and the San Gabriel Valley, and the restructured E Line, connecting Santa Monica and East Los Angeles. The Regional Connector is scheduled to open in 2022.[4]
Nearby landmarks
The station's name reflects the station's location near a variety of museums and arts centers, including:
References
- "2nd Pl/Hope St Station". Metro.
- Hymon, Steve (February 23, 2017). "Actions taken today by the Metro Board of Directors". The Source. Metro.
- "Regional Connector Transit Project 2nd Pl/Hope St Station: Pedestrian Bridge Option Fact Sheet" (PDF). Metro. 2014.
- Nelson, Laura J. (March 18, 2015). "L.A. Metro's downtown subway project may not open until mid-2022". Los Angeles Times.


