HTMS Angthong
HTMS Angthong (LPD-791) is a Royal Thai Navy amphibious ship based on the design of Endurance-class landing platform dock of the Republic of Singapore Navy.
| _in_February_2016.JPG.webp) HTMS Angthong underway on 12 February 2016. | |
| History | |
|---|---|
|  Thailand | |
| Name | 
 | 
| Namesake | Ang Thong Islands | 
| Ordered | 11 November 2008 | 
| Builder | ST Engineering | 
| Laid down | 2009 | 
| Launched | 21 March 2011 | 
| Commissioned | 19 April 2012 | 
| Homeport | Chonburi | 
| Identification | 
 | 
| Status | Active | 
| General characteristics | |
| Class and type | Endurance-class landing platform dock | 
| Displacement | 
 | 
| Length | 141.0 m (462 ft 7 in) | 
| Beam | 21.0 m (68 ft 11 in) | 
| Draught | 5.0 m (16 ft 5 in) | 
| Ramps | 2 × (bow and stern) | 
| Installed power | 
 | 
| Propulsion | 
 | 
| Speed | In excess of 15 kn (28 km/h; 17 mph) | 
| Range | 5,000 nmi (9,300 km; 5,800 mi) at 15 kn (28 km/h; 17 mph) | 
| Boats & landing craft carried | |
| Capacity | 18 tanks, 20 vehicles and bulk cargo | 
| Troops | > 350–500 | 
| Crew | 65 (8 officers and 57 men) | 
| Sensors and processing systems | 
 | 
| Electronic warfare & decoys | 
 | 
| Armament | 
 | 
| Aircraft carried | AS 332M Super Puma or AS532UL/AL Cougar or CH-47SD Chinook helicopters | 
| Aviation facilities | Flight deck and enclosed hangar for up to 2 medium-lift helicopters | 
Construction and career
    
On 11 November 2008, a SGD 200 million contract was signed between ST Marine and Thailand for the sale of one unit of the Endurance-class LPD and its associated landing craft.[2][3] The LPD would use the Terma C-Series system, which includes the C-Flex combat management system, C-Search radar suite which includes the Scanter 4100 radar and IFF, and the C-Fire fire control system.[4]
On 21 March 2011, the new ship was christened HTMS Angthong (pennant number LPD-791) and was launched from ST Marine's dockyard by the wife of Admiral Khamthorn Pumhiran, Commander-In-Chief of Royal Thai Navy (RTN). The delivery of the ship was completed on 19 April 2012.[5]
References
    
- "RSN – Assets – Weapons". Ministry of Defence (Singapore) (MINDEF). 23 July 2010. Archived from the original on 20 July 2008. Retrieved 15 September 2010.
- "ST Engineering's Marine Arm Secures S$200m Contract To Design And Build Landing Platform Dock". STE. Archived from the original on 2010-01-25. Retrieved 2009-10-11.
- "ST Marine wins contract for Thai amphibious vessels". Jane's Navy International. November 2008.
- "C-Series Combat System from Terma to the Royal Thai Navy's Landing Platform Dock". Terma. Archived from the original on 2011-07-16. Retrieved 2009-10-11.
-  "Navy officially welcomes HTMS Ang Thong to fleet". Bangkok Post. 20 April 2012.{{cite web}}: CS1 maint: url-status (link)





