Line 7 (Suzhou Rail Transit)
Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]
| Line 7 | |
|---|---|
| Overview | |
| Status | Under construction (one segment is operational) |
| Owner | Suzhou Rail Transit Co., Ltd |
| Termini | Moyang Muli |
| Stations | 33 |
| Service | |
| Type | Rapid transit |
| System | Suzhou Rail Transit |
| Operator(s) | Suzhou Rail Transit Co., Ltd |
| Technical | |
| Line length | 29.6 km |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]
It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]
Stations
| Station name | Connections | Distance km |
Location | |||
|---|---|---|---|---|---|---|
| English | Chinese[4] | |||||
| Moyang | 莫阳 | 0.000 | 0.000 | Xiangcheng | ||
| Xiangchengdadao North | 相城大道北 | |||||
| Suzhou North Railway Station | 高铁苏州北 | 2 | ||||
| Huizhanzhongxin | 会展中心 | |||||
| Qinglongganglu | 青龙港路 | |||||
| Fuyuanlu | 富元路 | |||||
| Litanghelu | 蠡塘河路 | |||||
| Chunshenhudonglu | 春申湖东路 | |||||
| Xiangcheng Administrative Center North | 相城区行政中心北 | |||||
| Xiangcheng Administrative Center South | 相城区行政中心南 | 8 | ||||
| Baidang South | 白荡南 | SIP | ||||
| Yangdonglu | 扬东路 | |||||
| Yanghualu | 扬华路 | |||||
| Xiandaidadao West | 现代大道西 | |||||
| Central Park | 中央公园 | 1 | ||||
| Zhongxindadao West | 中新大道西 | 6 | ||||
| Huangtiandang | 黄天荡 | 5 | ||||
| Loufeng | 娄葑 | |||||
| Dongxinglu West | 东兴路西 | |||||
| Tongyuanlu South | 通园路南 | 3 | ||||
| Linjiatanlu | 林家潭路 | Wuzhong | ||||
| Guoxiang | 郭巷 | 2 | ||||
| Yinzhonglu South | 尹中路南 | |||||
| Chenghudonglu | 澄湖东路 | |||||
| Fengjinlu | 枫津路 | |||||
| Hongzhuang | 红庄 | 4 | ||||
| Lishu | 蠡墅 | |||||
| Shihu Moshe | 石湖莫舍 | |||||
| Yuexi | 越溪 | |||||
| Wenxi Lu | 文溪路 | |||||
| Tian'edang Lu | 天鹅荡路 | |||||
| Suzhouwan North | 苏州湾北 | |||||
| Muli | 木里 | |||||
References
- "苏州轨道交通7号线开工建设". 2019-12-25.
- "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29.
{{cite web}}: CS1 maint: archived copy as title (link) (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010)) - 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
- "苏州轨道交通6、7、8号线站名方案征集公告". 2021-01-18.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.