Wankaner–Surendra Nagar section
The Wankaner–Surendranagar section belongs to Western Railway of Rajkot Division in Gujarat State.
| Wankaner–Surendra Nagar section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 
 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Wankaner–Surendranagar section | |
|---|---|
| Overview | |
| Status | Operational | 
| Owner | Indian Railways | 
| Locale | Gujarat | 
| Termini | Wankaner Surendranagar | 
| Service | |
| Operator(s) | Western Railway | 
| History | |
| Opened | 1890 | 
| Technical | |
| Track length | 74 km (46 mi) | 
| Number of tracks | 1 | 
| Track gauge | 5 ft 6 in (1,676 mm) broad gauge | 
History
    
Sir Lakhdiraji, who ruled from 1922 until 1948. Sir Lakhdiraji acted as a ruler, manager, patron and policeman of the state with great authority. Sir Lakhdiraji, like other contemporary rulers of Saurashtra, built roads and a railway network (of seventy miles), connecting Wadhwan and Morbi. Surendranagar-Rajkot section was laid in 1890.[1] Gauge conversion of Viramgam–Hapa section via Surendranagar, Wankaner was completed by 1980.[2] Morvi State Railway was merged into the Western Railway on 5 November 1951.
Freight
    
About 26 trains pass through this section daily.[3]
Doubling
    
Doubling work on this section is expected to be commenced by December 2016.
References
    
    
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.












