Gangxia North station
Gangxia North station (Chinese: 岗厦北站; pinyin: Gǎngxià Běi Zhàn) is a station of Line 2 and Line 10 of the Shenzhen Metro. Line 2 platforms opened on 28 June 2011. The line 10 platforms will not open until line 11 and line 14 open in 2022.[1]
![]() | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Futian District, Shenzhen, Guangdong China | |||||||||||||||
| Operated by | SZMC (Shenzhen Metro Group) | |||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | 2 (1 island platform) | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Disabled access | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | 223 | |||||||||||||||
| History | ||||||||||||||||
| Opened | 28 June 2011 2022 (Line 10, 11, 14) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
It will be a massive transfer station of Line 10, Line 11 and Line 14 in the future.[2] Measuring 220,000 meters square, it will be nearly twice as large as the nearby intermodal Futian Station.[2]
Station layout
| G | - | Exit |
| B1F Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs Transfer Passage between Line 2 and Line 10 (Under construction) |
| B2F Platforms |
Platform 1 | ← Line 2 towards Chiwan (Civic Center) |
| Island platform, doors will open on the left | ||
| Platform 2 | → Line 2 towards Yantian Road (Huaqiang North) → | |
| Platform | ← Line 11 towards Bitou (Futian) (under construction) | |
| Island platform, doors of will open on the left (Line 11) / right (Line 14) | ||
| Platform | ← Line 14 termination platform (under construction) | |
| Platform | → Line 14 towards Shatian (Huangmugang) → (under construction) | |
| Island platform, doors will open on the right (Line 14) / left (Line 11) | ||
| Platform | → Line 11 towards Hongling South (The Eighth Affiliated Hospital of Sun Yat-sen University) → (under construction) | |
| B3F Platforms[lower-alpha 1] |
Side platform, doors will open on the right | |
| Platform | ← Line 10 towards Futian Checkpoint (Gangxia) (does not stop here) | |
| Platform | → Line 10 towards Shuangyong Street (Lianhuacun) → (does not stop here) | |
| Side platform, doors will open on the right | ||
- Not in operation for transfer to line 2 before line 11 and line 14 open, which is planned to open in 2022.
Exits
| Exit | Destination |
|---|---|
| Exit A | Galaxy Century, Caitian Road, Hong Jia Hotel, Rencai Building, Phoenix Mansion, Caihong Xindu, Top Living, Zhongshen Garden |
| Exit B | Shennan Boulevard, Shenzhen No.1 Vocational School of Technology, Central Park, Tianmiancun, Green Oasis School |
References
- "站点查询". Shenzhen Metro. 2020-08-05.
- "福田站的1.6倍!22万平"地下帝国"岗厦北超级枢纽来了". sohu.com. Retrieved 2 April 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
